world’s longest rail tunnel sees light at end of decades’ wait
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

World’s longest rail tunnel sees light at end of decades’ wait

Arab Today, arab today

Arab Today, arab today World’s longest rail tunnel sees light at end of decades’ wait

Miners celebrate after a giant drilling machine completes the tunnel beneath theSwiss Alps
Geneva - Arab today

When Swiss engineer Carl Eduard Gruner came up with the idea to build the world’s longest rail tunnel under the Alps in 1947, he predicted the visionary project could be finished by the start of the 21st century.

He would turn out to be off by 16 years.

Gruner’s sketch and technical paper, called Journey through the Gotthard Base Tunnel (GBT) in the year 2000, planted the seeds for a venture that will be launched this week and aims to transform travel through the heart of Europe.

Constructing the 57-kilometre rail tunnel took just over 12 billion Swiss francs (Dh44 billion) and some 2,400 workers, according to Swiss government statistics.

More than 28 million tonnes of rock had to be excavated from the mountain near the Gotthard pass

The bumpy road from Gruner’s initial idea to the official start of construction in 1999 included bureaucratic delays and concern over the project’s financial viability.

Switzerland’s federal government set up a committee in 1963 to look into the building of an alpine base tunnel, but opinions were split over various proposals, before an official body eventually ruled in 1983 that the project was “not urgent.”

Momentum in favour of the GBT built again ahead of a 1992 referendum, which supported the project, but public outcry about the expense put work on hold.

Eventually, a November 1998 referendum closed the deal, when 64 per cent of Swiss voters approved the final plans along with funding schemes, including a new road tax.

“It’s a big engineering achievement,” Martin Knights of the London-headquartered Institution of Civil Engineers, said.

The tunnel runs from Erstfeld in the central Swiss canton of Uri, to Bodio in southern Ticino canton, and will shave the train journey from Zurich to Milan in northern Italy down to two hours and 40 minutes, roughly an hour less than it currently takes.

The new route also aims to make rail freight more efficient including by supporting heavier cargo, which should reduce the number of diesel-guzzling lorries on the roads, in turn, improving traffic and curbing pollution.

The number of daily rail passengers is also expected to increase from the current rate of 9,000 people to 15,000 by 2020, according to the Swiss federal railway service.

In a study of the GBT’s possible economic benefits, Swiss bank Credit Suisse forecast a range of positive impacts driven by an easier movement of goods, growth in day-trip tourism and higher property values in the affected cantons linked to increased accessibility.

German Chancellor Angela Merkel, French President Francois Hollande and Italian Prime Minister Matteo Renzi, along with Swiss officials, are due to attend Wednesday’s grand opening, which will feature a ceremonial run.

Full service starts in December.

Had Gruner attempted to break ground on the tunnel when he conceived the idea 69 years ago, engineers would have had to undertake a costly and dangerous effort to blast and drill through a massive amount of mountain rock.

But the project benefited in the end from major technical advances in tunnel-boring machines that began to pick up in the 1960s and 70s, Knights said.

The boring machinery used for the Gotthard Tunnel is “a whole moving factory, half a kilometre in length”, which synchronises all the steps needed to carve a passage through a mountain, he said.

While cutting through the rock, the machine throws the debris backwards and simultaneously places the pre-formed segments of concrete that form the shape of the tunnel.

A separate system grouts the pieces together.

Editor of Ground Engineering magazine, Claire Smith, said the success of the ambitious Gotthard venture, which was completed on schedule, “has cleared the path for many other [similar] projects”.

The GBT has been viewed as a trailblazer for a high-speed rail link between the French city of Lyon and Turin in northern Italy, which has faced delays and opposition from environmental groups.

It also paves the way for Austria’s Brenner Tunnel, set to open in about a decade.

When it officially opens on Wednesday, the GBT will overtake Japan’s 53.9-kilometre Seikan tunnel as the world’s longest train tunnel and bump the 50.5-kilometre Channel Tunnel that links England and France into third place.

The Brenner Tunnel could however slot into second place when it opens, with an estimated length of 55 kilometres

source : gulfnews

 

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

world’s longest rail tunnel sees light at end of decades’ wait world’s longest rail tunnel sees light at end of decades’ wait

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

world’s longest rail tunnel sees light at end of decades’ wait world’s longest rail tunnel sees light at end of decades’ wait

 



GMT 03:19 2018 Tuesday ,02 January

5 ways to jump-start your heart health

GMT 20:17 2017 Friday ,29 September

Playboy's impact on women still has people talking

GMT 09:05 2017 Saturday ,11 February

How algorithms (secretly) run the world

GMT 07:57 2016 Friday ,09 December

At least 50,000 Daesh fighters killed

GMT 05:44 2017 Monday ,25 September

Air Berlin sell-off: what passengers need to know

GMT 00:52 2017 Thursday ,14 December

Komi President leaves Bahrain

GMT 02:05 2017 Saturday ,28 October

Aug24/Sep23

GMT 18:23 2017 Thursday ,23 February

Ashmawi supports latest economic decisions

GMT 01:04 2017 Tuesday ,03 January

Border guards destroy openings to 12 tunnels in Sinai

GMT 15:57 2017 Friday ,10 February

King Fahd Chair for Cancer Research gets new chair

GMT 04:18 2017 Monday ,27 February

UN concerned over new West Bank demolition plans

GMT 12:55 2017 Thursday ,09 November

Red is the trendy color

GMT 20:21 2017 Tuesday ,05 September

Eastern EU states seek 'compromise' on cheap labour

GMT 08:09 2017 Friday ,05 May

Yemen’s army restores control on Omari Camp

GMT 20:31 2017 Wednesday ,08 November

Zayed University showcases student accomplishments

GMT 09:58 2016 Wednesday ,23 March

cartoon four

GMT 08:59 2018 Sunday ,09 December

KSA, Tunisia seek ways to bolster ties
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday