south australia aims for gas plant battery to fix power crisis
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

South Australia aims for gas plant, battery to fix power crisis

Arab Today, arab today

Arab Today, arab today South Australia aims for gas plant, battery to fix power crisis

Storm clouds can be seen above the Bayswater coal-powered thermal power station
Sydney - Arab Today

Australia’s most renewable-energy dependent state outlined plans on Tuesday to spend A$510 million ($385 million) to keep the lights on, just four days after Tesla Inc. Chief Elon Musk offered to save the state from blackouts by installing large-scale battery storage.
The plan includes A$150 million to encourage development of a 100MW battery storage plant, possibly from Musk or from a number of local providers.
The state will also build and operate a new A$360 million gas power plant to help stabilize its electricity system.
The South Australia (SA) government came up with the emergency plan after a statewide blackout last September during a wild storm that left homes and businesses in the dark for up to 8 hours and paralyzed some industries for up to two weeks.
The state, which relies on wind for about a third of its power capacity, has become vulnerable to outages and soaring prices, as it does not have enough back-up power when the wind is not blowing.
South Australia’s last coal-fired power station shut down last May, as it was making losses, and one of two units at a gas-fired power plant has been mothballed as its owner, France’s Engie SA, has struggled to secure affordable gas.
“Today, SA takes hold of its energy future. We have a national electricity market which is failing not only SA but failing the nation,” South Australia’s Premier Jay Weatherill said in a statement.
Asked about the proposal for new battery technology, Weatherill said he was speaking to a range of providers.
“We want as much local content as possible,” he told a news conference.
“We also need to put in the balance the reputational effect of attracting an international player of the size of Elon Musk to SA. These are all things that we are going to balance.”
The situation for South Australia could get worse with the closure this month of a major coal-fired plant, Hazelwood, also owned by Engie, in neighboring Victoria state, another crucial source of back-up power via an interstate link.

Source: Arab News

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

south australia aims for gas plant battery to fix power crisis south australia aims for gas plant battery to fix power crisis

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

south australia aims for gas plant battery to fix power crisis south australia aims for gas plant battery to fix power crisis

 



GMT 14:44 2017 Monday ,19 June

Boeing announces latest plane at Paris Air Show

GMT 08:51 2017 Wednesday ,03 May

21 Iraqi journalists killed in one year

GMT 10:04 2016 Wednesday ,28 September

Brexit and terror fears loom large for German consumers

GMT 19:37 2017 Monday ,18 September

Germany's Free Democrats may stall EU reform hopes

GMT 14:43 2017 Sunday ,15 October

Somalia truck bomb death toll hits 137

GMT 02:16 2017 Wednesday ,22 March

New research institute at Gulf Medical University

GMT 18:54 2017 Tuesday ,26 September

MP appreciates Sisi’s efforts

GMT 00:45 2018 Friday ,12 January

BDF Commander-in-Chief visits unit

GMT 17:56 2017 Wednesday ,13 December

Democrat Jones beats Moore in Alabama race

GMT 12:38 2017 Monday ,02 October

Etoile Sahel edge Ahly in Tunisia thriller

GMT 10:21 2017 Thursday ,09 March

Metro aims to break new ground in car-mad Qatar

GMT 12:48 2016 Saturday ,04 June

WHO to weigh Rio Olympics impact

GMT 00:09 2017 Friday ,17 February

Attends press conference of Sharm el-Sheikh

GMT 22:27 2011 Wednesday ,13 April

Type 2 diabetes \'cut\' after weight-loss surgery

GMT 10:48 2017 Thursday ,21 September

Japan PM says time for North Korea dialogue is over

GMT 06:25 2017 Friday ,06 October

Kazuo Ishiguro wins Nobel Prize for Literature
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday