japan nuclear plant workers pump out toxic water
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

Japan nuclear plant workers pump out toxic water

Arab Today, arab today

Arab Today, arab today Japan nuclear plant workers pump out toxic water

TOKYO - AFP

  Workers at a quake-hit nuclear plant in Japan on Tuesday began removing highly radioactive water from a reactor turbine building, a key step towards restoring cooling systems, the government said.

The 9.0-magnitude earthquake and tsunami that hit the northeast coast of Japan on March 11 knocked out power systems at the Fukushima Daiichi plant, causing cooling systems to fail and triggering a series of explosions.
To prevent a nuclear catastrophe, crews have pumped thousands of tonnes of seawater and later freshwater into the reactors and pools, creating a massive amount of radioactive runoff, some of which has leaked into the ocean.
About 10,000 tonnes of highly radioactive water will be transferred from the turbine building of reactor no. 2 to a treatment facility inside the plant for processing, Japan's Nuclear and Industrial Safety Agency (NISA) said.
NISA spokesman Hidehiko Nishiyama said the operation would allow emergency crews battling to stabilise the plant to "pour more water into the reactor in order to gradually decrease the amount of water dousing".
"We expect to purify and remove salt from water transferred to the waste treatment facility so that it can be poured into the reactor core again."
The move is necessary in order to start work to restore cooling functions at the nuclear plant, where workers have found turbine buildings, trenches and shafts submerged in highly radioactive water.
Tens of thousands of people living near the 1970s-era plant have been forced to evacuate their homes as radiation has leaked into the air, soil and sea.
Embattled operator Tokyo Electric Power Company said Sunday it hopes to reduce radiation leaking from the plant in three months and to achieve "cold shutdowns" of all reactors within six to nine months.

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

japan nuclear plant workers pump out toxic water japan nuclear plant workers pump out toxic water

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

japan nuclear plant workers pump out toxic water japan nuclear plant workers pump out toxic water

 



GMT 09:37 2012 Saturday ,28 April

Asamoah Gyan celebrates UAE title

GMT 06:57 2017 Tuesday ,12 December

Latest Grateful Dead resurrection -- a duo

GMT 14:03 2017 Friday ,10 February

3 Chinese miners killed in accident in Albania

GMT 10:06 2018 Sunday ,14 January

Qanso, Kijian tackle recent developments

GMT 18:58 2017 Saturday ,04 March

Gold prices continue to fall

GMT 12:49 2017 Thursday ,24 August

Fadl Shaker could be arrested soon

GMT 02:06 2017 Monday ,30 October

May22/Jun21

GMT 22:28 2017 Thursday ,24 August

February20th-March20th

GMT 08:07 2017 Saturday ,18 November

BBA President visits BHA

GMT 02:27 2017 Saturday ,28 October

September24th-October23rd

GMT 14:20 2017 Saturday ,26 August

Former VW engineer gets 40 months
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday