worlds longest tunnel opens in switzerland
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

President Schneiders ,Chancellor Merkel

World's longest tunnel opens in Switzerland

Arab Today, arab today

Arab Today, arab today World's longest tunnel opens in Switzerland

World's longest tunnel opens in Switzerland
Erstfeld , Switzerland - Arab Today

Switzerland: The world’s longest tunnel officially opened on Wednesday, with the trailblazing rail passage under the Swiss Alps aiming to ease transit through the heart of Europe.
With political unity on the continent shaken by a massive influx of migrants and the looming threat of Britain’s EU departure, Swiss president Johan Schneider-Amman said the tunnel would “join the people and the economies” of Europe.
He spoke before the 57-kilometer (35-mile) Gotthard Base Tunnel (GBT) made its ceremonial first run with European leaders on board.
The passengers included German Chancellor Angela Merkel, French President Francois Hollande and Italian Prime Minister Matteo Renzi.
While the tunnel was entirely funded by non-EU member Switzerland, the bloc’s transport commissioner Violeta Bulc has hailed it as “a godsend” for the continent.
It runs from Erstfeld in the central canton of Uri, to Bodio in the southern Ticino canton.
Travel through the Alpine region, by rail or by road, requires taking a zigzag and undulating route.
The Gotthard Base Tunnel was designed to offer a better option for both private travelers and commercial freights.
When the full service opens in December, the tunnel will shave the train journey from Zurich to Milan in northern Italy down to two hours and 40 minutes, roughly an hour less than it currently takes.
It should also make rail freight more efficient — partly by supporting heavier cargo, which should reduce the number of smoke-spewing lorries on the roads, in turn improving traffic and curbing pollution.
The number of daily rail passengers is expected to increase from the current rate of 9,000 people to 15,000 by 2020, according to the Swiss federal railway service.

3,800 hours of non-stop work
The rough design for a rail tunnel under the Gotthard Pass was first sketched by Swiss engineer Carl Eduard Gruner in 1947.
But bureaucratic delays, concerns over the cost and other hurdles pushed back the start of construction until 1999.
The work took 17 years at a cost of more than 12 billion Swiss francs ($12 billion, 11 billion euros).
According to the Swiss rail service, it also took 43,800 hours of non-stop work by 125 laborers rotating in three shifts to lay the tunnel’s slab track.
The ambitious venture was largely made possible by technical advances in tunnel-boring machines, which replaced the costly and dangerous blast-and-drill method.
The primary machine used to make the Gotthard tunnel was roughly 410-meters long and functioned like a mobile factory.
It cuts through rock and throws the debris backwards while simultaneously placing the pre-formed segments of concrete that form the shape of the tunnel.
A separate system grouts the pieces together.
With its official opening, the GBT has surpassed Japan’s 53.9-kilometer Seikan tunnel as the world’s longest train tunnel.
The 50.5-kilometer Channel Tunnel that links England and France has been bumped into third place.

Source: Arab News

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

worlds longest tunnel opens in switzerland worlds longest tunnel opens in switzerland

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

worlds longest tunnel opens in switzerland worlds longest tunnel opens in switzerland

 



GMT 20:00 2017 Saturday ,05 August

Heat in S Asia could exceed survivable levels by 2100

GMT 11:59 2017 Saturday ,01 July

Jordanian prince becomes UN`s next rights chief

GMT 20:23 2017 Monday ,13 February

Zamalek team mission back home after Super Cup win

GMT 12:40 2017 Wednesday ,18 January

Coach Norman the final piece in Wawrinka's puzzle

GMT 19:17 2018 Tuesday ,23 October

Saudi public sector workers’ bonuses reinstated

GMT 09:15 2018 Saturday ,06 January

Russia says US 'looking for reasons' to pressure Iran

GMT 07:21 2017 Wednesday ,27 December

Bali remains safe: President Jokowi

GMT 03:50 2017 Monday ,14 August

Commandos kill 25 jihadists in central Syria

GMT 06:41 2017 Friday ,17 March

Crown Prince meets UAE’s Minister of Energy

GMT 09:50 2017 Thursday ,09 March

New ideas for Emirati women’s programmes welcome

GMT 04:12 2016 Wednesday ,21 December

FIFA Club World Cup returns to familiar turf

GMT 04:57 2017 Thursday ,01 June

Dar Al Ber honours Low-income Families Committee

GMT 16:10 2017 Wednesday ,12 April

Dortmund’s Bartra injured in team bus explosion
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday