scorpion robot mission inside fukushima reactor aborted
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

After the probe ran into trouble

'Scorpion' robot mission inside Fukushima reactor aborted

Arab Today, arab today

Arab Today, arab today 'Scorpion' robot mission inside Fukushima reactor aborted

Tokyo - Arab Today

A "scorpion" robot sent into a Japanese nuclear reactor to learn about the damage suffered in a tsunami-induced meltdown had its mission aborted after the probe ran into trouble, Tokyo Electric Power company said Thursday.

TEPCO, the operator of the Fukushima nuclear plant, sent the remote-controlled device into the No. 2 reactor where radiation levels have recently hit record highs.

The "scorpion" robot, so-called because it can lift up its camera-mounted tail to achieve better viewing angles, is also designed to crawl over rubble inside the damaged facility.

But it could not reach its target destination beneath a pressure vessel through which nuclear fuel is believed to have melted because the robot had difficulty moving, a company spokeswoman said.

"It's not immediately clear if that's because of radiation or obstacles," she said, adding that TEPCO is checking what data the robot was able to obtain, including images.

A massive undersea earthquake on March 11, 2011 sent a huge tsunami barrelling into Japan's northeast coast, leaving more than 18,000 people dead or missing, and sending three reactors into meltdown at the plant in the worst such accident since Chernobyl in 1986.

The Japanese government said in December that it expects the total costs -- including compensation, decommissioning and decontamination -- to reach 21.5 trillion yen ($189 billion) in a process likely to take decades as high radiation levels slow operations.

The robot, 60 centimetres (24 inches) long, is made by Toshiba and equipped with two cameras and sensors to gauge radiation levels and temperatures.

"Scorpion's mission is to take images of the situation and collect data inside the containment vessel," TEPCO spokesman Shinichi Nakakuki said earlier.

"Challenges include enduring high levels of radiation and moving on the rough surface," he said.

Radiation levels inside the reactor were estimated last week at 650 sieverts per hour at one spot, which can effectively shut down robots in hours.

But the probe -- designed to withstand up to 1,000 sieverts of radiation in total -- would not sustain severe damage because it was unlikely to remain for too long at a single point, Nakakuki said.

Source: AFP

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

scorpion robot mission inside fukushima reactor aborted scorpion robot mission inside fukushima reactor aborted

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

scorpion robot mission inside fukushima reactor aborted scorpion robot mission inside fukushima reactor aborted

 



GMT 09:50 2018 Friday ,07 December

At least 18 Afghan soldiers killed in Taliban attack

GMT 12:10 2017 Friday ,01 December

Brazil's Gremio win third Copa Libertadores crown

GMT 17:23 2017 Monday ,28 August

Saudi Arabia's efforts to serve pilgrims stressed

GMT 23:02 2016 Monday ,21 March

Kim Jones: flights of fancy

GMT 09:21 2017 Friday ,15 December

Blockbuster: Disney to expand empire with Fox tie-up

GMT 00:07 2017 Sunday ,10 December

Over 200 fossilized eggs found in China

GMT 15:26 2017 Thursday ,30 March

It’s over: Britain files for divorce from the EU

GMT 07:30 2015 Friday ,04 September

Pamela Anderson urges Russia to save whales

GMT 22:10 2016 Thursday ,22 September

Yemen FM: Cabinet to start work from Aden in 2 weeks

GMT 02:01 2017 Thursday ,19 October

September24th-October23rd

GMT 23:55 2017 Thursday ,13 July

Mubarak refuses to eat and `extremely weak`
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday